Manuals

 

“Tell me and I forget. Teach me and I remember.

Involve me and I learn.”  –  Benjamin Franklin

Need more help?  Tech (661) 993-5111

 

DOWNLOAD THE MREV AND PLENUM SPACER MANUAL

 

WATCH THE VIDEO BY MOTORDYNE ENGINEERING

DOWNLOAD THE M370 MANIFOLD INSTALLATION MANUAL

 

 

MOTORDYNE ART PIPE INSTALLATION

 

On the driver side floor panel heat shield there is a M6 stud that protrudes down about 1”.   This stud will create an interference fit. Trim the stud flush down to the panel to allow for ART pipe clearance.  Install all the bolts for the ART pipes only finger tight, then adjust rotation/alignments as needed, then tighten all the bolts working from front to back starting at the inlet to the brace to the outlet.

 

Tighten bolts to 70 ft/lbs torque.  Checking and retightening the bolts is recommended after ~100 miles of driving to insure a good permanent seal.  The vibration dampening bracket on the side branch resonator must be connected to the catalytic converter brace.  Failure to do so may cause the pipe to eventually crack and voids warranty.

 

If you have any questions during your installation feel free to contact us at:

(661) 993-5111

Thank you,

Motordyne Engineering

 

untitled

rfwbs-slide